Work Packages

From requirements analysis to stabilisation — REAKT is structured into six interlocking work packages.

Problem, Environment and Requirements Analysis

Recording the legal, specialist and technical requirements for the ecosystem together with hospitals, authorities and industry partners; analysis of existing systems and establishment of the project advisory board.

Ecosystem Concept

Development of the overall specialist and technical concept for the federated resource system.

Use Case & Proof of Concept

Testing the concept using a concrete use case in the Berlin trauma network.

Implementation

Technical implementation of the system based on the validated requirements and the concept.

Simulation

Testing the system under simulated crisis, mass casualty and alliance scenarios.

Stabilisation

Transfer of the project results into permanent operation and scaling to further trauma networks.